Please see a selection of images in the gallery below.
- The outlet channel ready to receive the screw
- Work on the outlet channel
- Work on the outlet channel
- Work on the outlet channel
- Stonework on the powerhouse
- The generator and gearbox
- Screw being delivered
- Screw going into the river
- Screw in place
- Screw lifted into place
- Screw lifted into the water
- Flood – Storm Damage
- Safe Access with hand rails to the Hydro House
- Shows the flow of water into the inlet is contorted by being first “reflected” off the edge of the weir along the side wall of the intake and then sweeps around through 180 degrees to enter the intake.